바로가기 메뉴
주요메뉴 바로가기
본문 바로가기
하단메뉴 바로가기

[R2] Research Facility Construction Plan (DOE, US)

[R2] Research Facility Construction Plan (DOE, US) [이미지]
  • Overview
    This report introduces the large research equipment & facility construction and upgraded plan developed by the Roadmap Construction Advisory Committee in the Department Energy (DOE) in the U.S. It was created to establish the technical ground for the discovery of historic science technology and incubation of new industry through the construction of high-end large research facilities. In addition, it was published to introduce large research facilities relating to energy-related studies that could lead future science and technology for the next two decades. This report is structured into short, mid and long-term proprieties, covering facilities, background, new aspects, and applications.
  • Table of Contents
    Ⅰ.Overview

    Ⅱ.Short-term priority
    International project to design and build an experimental fusion reactor
    Ultra-scale scientific computing capability
    Joint dark energy mission
    Linac coherent light source
    Protein production and tags
    Rare isotope accelerator
    Characterization and imaging of molecular machines
    Upgrade of continuous electron beam accelerator facilities (12GeV)
    Energy science network upgrade
    Upgrade of National Energy Research Scientific Computing Center
    Transmission electron achromatic microscope
    B-particle physics at the TeVatron

    Ⅲ.Mid-term priority
    Linear collider
    Analysis and modeling of cellular systems
    Upgrade of spallation neutron source (2-4 MW)
    2nd target station of spallation neutron source
    Whole proteome analysis
    Double beta decay underground detector
    Next-Step spherical torus experiment
    Relativistic heavy ion collider II

    Ⅳ.Long-term priority
    National synchrotron light source complex upgrade
    Super neutrino beam
    Advanced light source upgrade
    Advanced photon source upgrade
    Electron relative heavy ion collider
    Fusion energy contingency
    High-flux isotope reactor second cold source and guide hall
    Integrated beam experiment

list

메인으로 가기맨위로 가기